Twig was asked to assist George Hammond PLC with the challenges it faced at its Limekiln Lane site in Dover.

The job was a complex one, being located at the foot of the historic White Cliffs of Dover. It incorporated an unstable Napoleonic wall, high explosive gas container tanks, an extremely busy fuel forecourt, disused lime kilns and a considerable amount of work using a MEWP (Mobile Elevated Work Platform).

Twig’s attention to detail ensured that the task was completed safely, on budget and within the stipulated timescale.